Workstation op Bonaire: werken met uitzicht op zee
Combineer werk en tropisch leven op het Caribische eiland Bonaire

September 12, 2025, by Eldin Ganic
photo Van Oord
An LNG-powered trailing suction hopper dredger (TSHD) will deposit 1 million cubic meters of sand on and just in front of the beach.
For the first time in the Netherlands, this replenishment is being carried out by a TSHD that runs largely on Bio-LNG, resulting in a significantly lower CO₂ footprint.
The beach replenishment contracts were awarded to Van Oord earlier this year by Rijkswaterstaat.
We'll send you a nice letter once per week. No spam.